On the morning of September 8, a batch of single Hydraulic Rock Drill independently developed and produced by China Coal Group Machinery Co., Ltd. was inspected and loaded and shipped to Luliang, Shan
On the morning of August 23, a batch of single hydraulic rock drills independently developed and produced by China Coal Group Machinery Co., Ltd. was inspected and loaded and shipped to Anshun City, G
At the end of 2017, the Xicheng high-speed railway passing through the Qinling and Daba mountainous areas was completed, marking that the high-speed railway in the western region of China has been con
On the afternoon of August 8, a group of gasoline rock drills passed the inspection in the intelligent equipment manufacturing workshop of China Coal Group, officially loaded and shipped, and will be
On July 27th, a batch of air leg rock drills independently developed and produced by China Coal Group Machinery Co., Ltd. was inspected and loaded and shipped to Benxi City, Liaoninig Province.
At present, our oilers are made of plastic and filled with lubricant. Before drilling, we must turn on the oiler switch, the operation is relatively complicated.
© Shandong China Coal Group. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Linda Zhang